Our company focuses on the research and manufacturing of customized armrest molding. Focusing on intelligent manufacturing of automotive armrest molding and providing in-depth solutions in the field of armrest molding.With 20 years of experience in injection mold research and development, we focus on the subdivision of automotive interior parts and provide one-stop services from design to mass production of armrest molding for global car companies/modification brands/accessory suppliers.
Ningbo P&M Products Co., Ltd. is a large customized plastic armrest molding manufacturer and supplier in China.We have many years of industry experience and are professional and reliable. Having been deeply involved in the field of armrest molding for many years, we have accumulated rich experience in design and manufacturing. Familiar with major OEM and automotive parts supply chain standards, meeting high industry requirements, and possessing the ability to develop large-sized, complex structured, and high gloss surface molds.
Welcome to consult and cooperate!
If you are looking for high-quality armrest molding , please contact us and we will provide you with professional technical support and high-quality products!
Technical equipment hardware strength
Five axis precision machining center+German imported testing equipment, mold accuracy up to ± 0.01mm;
Moldflow predicts injection defects and increases the first sample success rate by 40%.
Flexible production response
Support small-scale trial production (starting from 100 pieces) to large-scale delivery with an annual production capacity of 500000 pieces;
The 24-hour engineering team is online, and emergency orders can be initiated through the green channel (with a delivery time of up to 15 days for T1 samples).
Service process transparency
Requirement analysis → 3D reverse modeling/original design → DFM report confirmation → Mold core CNC machining → T0 trial mold optimization → Batch production support**
Provide visual progress reports for each stage, with customer signatures confirming key milestones to ensure zero deviation in development.
Material Innovation: Recommend material solutions such as fiberglass reinforced nylon/low VOC environmentally friendly plastics to balance cost and performance;
Structural optimization: By reducing post-processing through in mold assembly design, the cost of a single piece can be reduced by up to 25%;
Mold life commitment: Made of Swedish Yishengbai steel, standard with a service life of 500000 times and lifetime maintenance.
A German car company project: Developing an electric adjustable armrest molding with a hidden cup holder to solve the problem of multi mechanism linkage tolerance;
Customization of new energy brands: bamboo fiber environmentally friendly material molds, achieving zero cracking in low temperature resistance testing at -30 ℃; Hot selling product in the after-sales market: Low cost quick release armrest mold, helping customers seize market share in Southeast Asia within 2 months.
Implement the IATF 16949 system throughout the entire process, providing size inspection reports/material ROHS certification/48 hour high and low temperature cycle testing data packages.
If you are looking for high-quality, durable, and cost-effective armrest molding, please feel free to contact us at any time! We look forward to working with you to create high-quality products together!
Pls provide |
2D, 3D, samples, or the size of the multi-angle pictures |
Mould Time |
20-35 Days |
Product time |
7-15 Days |
Mould precision |
+/-0.01mm |
Mould life |
50-100 million shots |
Producing Process |
Audit drawings - mold flow analysis - design validation - Custom Materials - mold processing - core processing - electrode machining - Runner system processing - parts processing and procurement - machining acceptance - cavity surface treatment process - complex mode Die - The entire mold surface coating - Mounting plate - mold sample - sample test - sending samples |
Mould cavity |
One cavity, multi-cavity or same different products be made together |
Mould material |
P20,2738,2344,718,S136,8407,NAK80,SKD61,H13 |
Runner system |
Hot runner and cold runner |
Base material |
P20,2738,2344,718,S136,8407,NAK80,SKD61,H13 |
Finish |
Pitting the word, mirror finish, matte surface, striae |
Standard |
HASCO, DME or dependent upon |
Main technology |
Milling, grinding, CNC, EDM, wire cutting, carving, EDM, lathes, surface Finish, etc. |
Software |
CAD,PRO-E,UG Design Time: 1-3 days (normal circumstances) |
Product material |
ABS,PP,PC,PA6,PA66,TPU,POM,PBT,PVC,HIPS,PMMA,TPE,PC/ABS,TPV,TPO,TPR,EVA,HDPE,LDPE,CPVC,PVDF,PPSU.PPS. |
Quality system |
ISO9001:2008 |
Establish time |
20days |
Equipment |
CNC,EDM,Cutting off Machine,plastic machinery,etc plastic suitcase mould zhe jiang |
1. Samples/drawings and requirements from you.
2. Mold design: After you place an order, we will communicate with you and exchange opinions.
3. Material procurement: steel cutting and mold basic tools.
4. Assembly.
5. Mold inspection: Track and control mold processing.
6. Mold testing: We will notify you of the date. Then the sample inspection report and injection parameters will be sent to you together with the sample!
7. Your shipping instructions and confirmation.
8. Make the mold before packaging.
9. We provide various plastic injection molds, blow molds, silicone molds, and die-casting mold services.
We are both a brand and a factory, with thousands of types of products, with high-quality service and quality as the first, we do not have a minimum order quantity, tell us your needs, we can provide you with the most professional service.
Once the mold is complete, I do a mold test. It usually takes about 3-5 days to complete. We need to assemble the mold, adjust the pressure data of the machine, and try production. We need to check whether there are problems during the normal production of the mold and make modifications.
Packaging according to your needs
1.By air ,it takes 3-7 days for delivery .The goods can be shipped by DHL ,Fedex ,UPS .
2.By sea ,the delivery time is based on your port .
To South East Asian Countries takes about 5-12 days
To Middle east countries takes about 18-25 days
To European countries takes about 20-28 days
To American countries takes about 28-35 days
To Australia takes about 10-15 days
To African countries takes about 30-35 days.
Video-1: (Factory Video)
Video-2: (Injection Molding)
Video-3: (Blow molding)
Video-4: (Blow molding)
Video-5: (Roll molding)
1. Who are we?
We are based in Zhejiang, China, start from 2014,sell to North America(30.00%),Southern Europe(10.00%),Northern.
Europe(10.00%),Central America(10.00%),Western Europe(10.00%),Mid East(10.00%),Eastern Europe(10.00%),South America(10.00%). There are total about 51-100 people in our office.
2. How can we guarantee quality?
Always a pre-production sample before mass production;
Always final Inspection before shipment.
3. What can you buy from us?
Mould,Plastic Product, Metal Product,Dental Product,CNC machining.
4. Why should you buy from us not from other suppliers?
Ningbo P&M Plastic Metal Product Co., Ltd. We main do all kinds of 3d design, 3d printing and plastic metal molds tooling and products. We have our own engineer and factory. One-stop supply:3d design - 3d printing - mold making - plastic injection.
5. What services can we provide?
Accepted Delivery Terms: FOB,CFR,CIF,EXW,FCA,DDP,DDU;
Accepted Payment Currency:USD,EUR;
Accepted Payment Type: T/T,L/C,PayPal,Western Union,Escrow;
Language Spoken:English,Chinese,Spanish,French,Russian.
6. What are the characteristics of your service?
1. Your inquiry related to our products or prices will be replied within 24hours.
2. Welltrained and experienced staffs to answer all your enquiries in fluent English.
3. Offering the support to solve the problem in the application or selling period.
4. Competitive prices based on same quality.
5. Guarantee samples quality same as mass production quality.